Banner
SkyrangerNynja

 

HOME

BEST OFF AIRCRAFT

AIRCRAFT MODELS

AIRCRAFT PRICES

As it comes in 7 boxes

Sorting out and checking contents

All the fiber glass bits
Basic cabin structure
Floor and engine mount

Wheels now on
Brake detail

Tailfeathers


Got an engine lets go flying
Love that Rotax
Seats, a great improvement
Wing frames
Trial fit wing frames with Ailerons and flaps fitted

Wings covered
Fiberglass panels
Rear fuse fitted

Floor pan and scuttle
Joining engine cowls and scuttle
Firewall fitted
Engine cowls fitted
Tail Surfaces reassembled
Firewall forward port side
Firewall forward Starboard side
Instrument panel and throttles
Instrument Pod
pod and consol
Just about complete here
The part I enjoy least
Choke control and fuel hoses
triming the panel
Triming the consol
View from the other side
Almost complete
Begining to look the part
Fuel tank, filler and vent pipes
Fitting the windscreen
Door frames
Door Skins
Doors and windows
Now with a prop
Looking better
A lot more room than Skyranger
Seats are very comfortable
Now with spats. Note split front spat
Assembled fitting Fowler flap strips
Making it look nice
Interior showing storage hammocks
A big day. 4.00 AM start to miss the trafic.
Assembled needs only jury struts and graphics
Another view
Weight and Ballance
With my Sister. Nine weeks and three days build time.
Nynja instrument panel
Award Winner